As Figure 3 shows, each
base flange is equipped
with three stake pegs.

Begin by determining exact
location of the four (4) corners of
the building. Mark front edge and

side-to-side width of assembly on
ground. Drive alignment stakes into

the ground outside of the markings,

and draw alignment strings along

both ends and sides of the building
to the dimensions shown in Figure
2. The outline of the strings will
represent the final location of the
base flanges. The initial location of

each Corner Base Flanges is critical

to the alignment and fit of the frame

components and cover.

Step #1 --SECURING BASE FLANGES

Sit the building boxes in the chosen location. Remove all the components

from packaging to ensure all components are present by checking with the

Part List.

Locate the Left Corner Base Flange

and Right Corner Base Flange(part

#5). Secure the base flanges with

Stake Pegs (Part #40).

Measurements shown in Figure 2

are to the center of the upright
sockets on each Base Flange.

The Shelter must be secured to a
firm surface that can receive and

retain stake pegs firmly in position.

The shelter should be installed on
FIRM GROUND, not on SWAMP,

SOFT/WET GROUND. The Base

Flanges must be secured so they
cannot be moved. Arches are
tensioned at their base as they
insert into the Base Plate sockets.

40

6

10.0m

2.0m

2.0m

8

7

5

0

.5

m

3

m

4

.0

m

2.0m

2.0m

2.0m

Figure 2   Position of Base Flanges

F

R

O

N

T

Diagonals are equal