background image

 

2013GK8005 

-18- 

PB/4 lift way 
 

 

PB/5 lift way 

 

 

Summary of Contents for SSC150905

Page 1: ...2013GK8005 SHELTER ASSEMBLY MANUAL MODEL SSC150905 L15 0 x W9 0 x H5 5m with overhead door...

Page 2: ...sponsibility to take of snow immediately if not slide off by itself READ ALL INSTRUCTIONS BEFORE ASSEMBLY 1 Keep work area clean Cluttered areas invite injuries Do not set up near snow drifts in slipp...

Page 3: ...Frame of front panel for door track connection 4230mm 1 D2 Door Frame for Back Panel 4230mm 2 E1 Purlin for Roof and Sidewall middle 2994mm 66 E2 Purlin for Roof and Sidewall side 2959mm 40 E4 A Purl...

Page 4: ...onnection of arch 108 L Bolt M12 for connection of purlin 270 M Tool for self driling bolt 1 N Steel Wire Rope with parts 4 sets O Knitting Rope for Cover 1 bundle P Nylon Tie for Front and Back Cover...

Page 5: ...2013GK8005 4...

Page 6: ...FOUNDATION INSTALLATION 1 Please refer to Anchor Sketch and Foundation Sketch to lay the foundations and fix the Upright No A1 to A6 Please note the sequence number and direction of Upright the openi...

Page 7: ...Anchors No Q for each hole 2 anchors for front and back panel B FRAME INSTALLATION 1 As Main Arch Sketch shows connect Rafter No B1 to B6 to Upright No A1 to A6 by Bolt M16 No K the high strength bol...

Page 8: ...When finish installing the main arches and door frames connect Purlins No E1 E2 E4 A E4 A1 E4 B onto them by using Bolt M12 Connect the Bracing Tubes No F1 F2 to the frame by Bolt M12 Please refer to...

Page 9: ...2013GK8005 8 Roof Structure Planform Sidewall Sketch with Bracing Tube...

Page 10: ...2013GK8005 9 Option Steel Wire Rope Installation Install the steel wire rope No N between uprights according to your requirements...

Page 11: ...oning tube is equipped with 3pcs of stakes for sidewall and front and back panel D Overhead Door Installation Please refer to the instruction for detail information 1 The side track and the vertical t...

Page 12: ...safely used in varied situation such as industrial door workshop door housewares door commercial door and residential door Garage door series according to the lift ways 1 The standard of PB 1 lift wa...

Page 13: ...l and to make sure the differences of the two diagonal lines is less than 5mm 1 2 If the measurement result is that the gap size does not matches the door panel or the differences of the two diagonal...

Page 14: ...2013GK8005 13 Piture 2 1 Position the vertical track...

Page 15: ...2013GK8005 14 Piture 2 2 Fix the vertical track...

Page 16: ...2013GK8005 15 Piture 2 3 Fix the track of high lift parts for PB 2 and PB 3 lift way To fix the track of high lift parts for PB 2 lift way...

Page 17: ...2013GK8005 16 To fix the track of high lift parts for PB 3 lift way...

Page 18: ...2013GK8005 17 Piture 2 4 Fix the horizontal curvely track PB 1 lift way PB 2 lift way...

Page 19: ...2013GK8005 18 PB 4 lift way PB 5 lift way...

Page 20: ...2013GK8005 19 3 To install the track hanger and buffer...

Page 21: ...2013GK8005 20...

Page 22: ...2013GK8005 21 To install the buffer...

Page 23: ...2013GK8005 22 4 To install the balance system 4 1 the shaft and the spring...

Page 24: ...2013GK8005 23 4 2 Position the shaft bracket 4 2 1 To make sure the position of shaft bracket...

Page 25: ...2013GK8005 24...

Page 26: ...the shaft bracket with wall together In order to fix the shaft bracket with wall firmly together we offer the fixing plate according to the wall material to fix the shaft plate anti break system plea...

Page 27: ...05 26 Some notes when installing the bolts When using two springs or the weight of door panel is above 300kgs need to add another one shaft plate on both sides of cable drum please find the following...

Page 28: ...m panel and anti break system Connect the anti break system with the roller and cable install them together with bottom panel make the panel connect well with the vertical track by rollers please find...

Page 29: ...ck connect the second panel with the bottom panel through the middle hinges and side hinges When installing please note the hinge direction there are two situations When the panel width is above 5m ne...

Page 30: ...the top door panel install the top roller bracket insert the roller into bracket and connect with the track beforehand adjust the position of top roller bracket according to the top panel and the tra...

Page 31: ...2013GK8005 30 To install top roller bracket of PB 4 and PB 5 double track lift way...

Page 32: ...clevis pin lock 6 galvanized tapping screws 6 3x19 5 anti break system 6galvanized tapping screws 6 3x19 5 6 To install the cable in the cable drum After installing the door and its accessories to fi...

Page 33: ...oor can be used normally 6 1 To adjust the panel position To fix the hinge angle by adjust the rollers make sure the rollers can be connected well with the track in order to adjust the position of who...

Page 34: ...spring fastening circle the fastening way is as below Loose the fastening screws in the spring plug take out the flat key use vigorously plers to fix the shaft to make sure the shaft will not move whe...

Page 35: ...2013GK8005 34 D the wire diameter X the number of fastening circle...

Page 36: ...3GK8005 35 Note the direction of spring fastening is as bellow After fastening the spring insert the flat key and fasten the fastening screws in the spring plug Finally check the force of spring balan...

Reviews: