2013GK8005
-6-
2. In order to reach the wind load and snow load, our suggestion is to dig 1.5m deep hole
for the anchors. There are 3 Anchors (No. Q) for each hole (2 anchors for front and back
panel).
B--FRAME INSTALLATION
1. As “Main Arch Sketch” shows, connect Rafter (No.B1 to B6) to Upright (No.A1 to A6)
by Bolt M16 (No.K, the high strength bolt for steel structure) to be an arch. There are
6pcs of bolts for every two parts and 6 arches for 15m long tent
.
Main Arch Sketch
Summary of Contents for SSC150905
Page 1: ...2013GK8005 SHELTER ASSEMBLY MANUAL MODEL SSC150905 L15 0 x W9 0 x H5 5m with overhead door...
Page 5: ...2013GK8005 4...
Page 9: ...2013GK8005 8 Roof Structure Planform Sidewall Sketch with Bracing Tube...
Page 14: ...2013GK8005 13 Piture 2 1 Position the vertical track...
Page 15: ...2013GK8005 14 Piture 2 2 Fix the vertical track...
Page 17: ...2013GK8005 16 To fix the track of high lift parts for PB 3 lift way...
Page 18: ...2013GK8005 17 Piture 2 4 Fix the horizontal curvely track PB 1 lift way PB 2 lift way...
Page 19: ...2013GK8005 18 PB 4 lift way PB 5 lift way...
Page 20: ...2013GK8005 19 3 To install the track hanger and buffer...
Page 21: ...2013GK8005 20...
Page 22: ...2013GK8005 21 To install the buffer...
Page 23: ...2013GK8005 22 4 To install the balance system 4 1 the shaft and the spring...
Page 24: ...2013GK8005 23 4 2 Position the shaft bracket 4 2 1 To make sure the position of shaft bracket...
Page 25: ...2013GK8005 24...
Page 31: ...2013GK8005 30 To install top roller bracket of PB 4 and PB 5 double track lift way...
Page 35: ...2013GK8005 34 D the wire diameter X the number of fastening circle...