Move & Install
Danger
Keep the equipment away from heat source or air
outlets.
In case of fire, use dry powder extinguisher only, any
liquid extinguisher can result in electric shock.
Warning
Do not start the system if any damage or abnormal parts
founded.
Contacting the UPS with wet material or hands may be
subject to electric shock.
Attention
Use proper facilities to handle and install the UPS.
Shielding shoes, protective clothes and other protective
facilities are necessary to avoid injury.
During positioning, keep the UPS way from shock or
vibration.
Install the UPS in proper environment, more detail in
section 3.3.
Debug & Operate
Danger
Make sure the grounding cable is well connected before
connecting the power cables, the grounding cable and
neutral cable must be in accordance with the local and
national codes practice.
Before moving or re-connecting the cables, make sure
to cut off all the input power sources, and wait for at
least 10 minutes for internal discharge. Use a multi-
meter to measure the voltage on terminals and ensure
the voltage is lower than 36V before operation
.
Risk of Voltage Backfeed. Before working on the
circuits, isolate the Uninterruptible Power Supply
(UPS), and then check for Hazardous Voltage
between all terminals including the protective earth.
Attention
The earth leakage current of load will be carried by
RCCB or RCD.
Initial check and inspection should be performed after
long time storing of UPS.
Maintenance & Replacement
Danger
All the equipment maintenance and servicing
procedures involving internal access need special tools
and should be carried out only by trained personnel. The
components that can only be accessed by opening the
protective cover with tools cannot be maintained by
user.
This UPS full complies with “IEC62040
-1-1-General and
safety requirements for use in operator access area
UPS”. Dangerous voltages are present within the battery