70 Shield T3 60 – 500KVA User Manual
A
Parallel interface inside
Zoom in A
area
(b)
The parallel interfaces of 4000kVA and 500kVA
Figure4-7
Location of the Parallel interface
The control cables for the parallel operation must be connected with all single devices
to form a closed loop, as is shown in
Figure4-8
Parallel connection
For more details of parallel operation, please refer to the “Instruction for
Parallel
Operation of Tower UPS”.