49(63)
3.5.3 Installation of Drying Hopper
1) Install drying hopper on the machine frame.
2) Fix the shut-off valve adaptor on the suction box.
3) Install the shut-off valve on the suction box.
Picture 3-6
:
Installation of Drying Hopper
3.5.4 Filter & Pressure Regulating Valve
1) Switch on the air source.
2) Pull the black pressure adjusting knob 1 upward and rotate it, observe the
pressure gauge 2, generally a 0.5 Mpa pressure is advisable.
3) Push back the black knob 1.
3.5.5 GXW/GW
Heatless Dehumidifying Compact Dryer
1) Install the dryer on the machine floor stand with screws.
2) Connect with the inlet/outlet tube.
Picture 3-7
:
GXW/GW Heatless Dehumidifying Compact Dryer
Summary of Contents for SDL-U Series
Page 1: ...SDL U HD Series Heatless Dehumidifying Compact Dryer Date Nov 2014 Version Ver B English...
Page 2: ......
Page 11: ...11 63 1 3 2 Outline Drawing Picture 1 1 Outline Drawing...
Page 17: ...17 63 Picture 2 1 Working Principle...
Page 27: ...27 63 2 3 2 Main Circuit SDL 20U 450U HD Picture 2 6 Main Circuit SDL 20U 450U HD...
Page 28: ...28 63 2 3 3 Control Circuit SDL 20U 450U HD Picture 2 7 Control Circuit 1 SDL 20U 450U HD...
Page 29: ...29 63 Picture 2 8 Control Circuit 2 SDL 20U 450U HD...
Page 38: ...38 63 Picture 2 10 Main electrical circuit SDL 600U 1200U HD...
Page 39: ...39 63 2 3 7 Control circuit SDL 600U 1200U HD Picture 2 11 Control circuit 1 SDL 600U 1200U HD...
Page 40: ...40 63 Picture 2 12 Control circuit 1 SDL 600U 1200U HD...