61(62)
6.4 Maintenance Schedule
6.4.1 About the Machine
Model SN Manufacture date
Voltage
Ф
V Frequency Hz Power kW
6.4.2 Check After Installation
Check if pipe connections are firmed locked by clips.
Check the gap between fixed blade and rotating blade.
Check the rotating balance of the belt wheel.
Electrical Installation
Voltage: V Hz
Specs of the fuse: 1 Phase A 3 Phase A
Check phase sequence of the power supply.
Check the rotating direction of the conveying blower.
6.4.3 Daily Check
Check main power switch.
Check emergency stop button.
Check start / stop button.
Check material check plate (strip) is perfect or not.
Check whether emergency stop and safety switch works normally.
Clean feed box.
Check whether start, stop and power switches are normal.
6.4.4 Weekly Check
Check all the electrical cables.
Check if there are loose connections of electrical components.
Check blade condition.
Check whether set screws in fixed and rotate blades are under looseness.
Check if there is abnormal noise, vibration and heat in reduction gear.
Check the cracking window
6.4.5 Monthly Check
Check the status of the belt.
Summary of Contents for SG-14 Series
Page 1: ...SG 14 Series Screenless Granulators Date Dec 2014 Version Ver B English ...
Page 2: ......
Page 8: ...8 62 ...
Page 13: ...13 62 1 3 2 Dimensions Picture 1 1 Dimensions ...
Page 30: ...30 62 2 3 Electrical Diagram 2 3 1 Main Circuit 400V Picture 2 12 Main Circuit 400V ...
Page 31: ...31 62 2 3 2 Control Circuit 400V Picture 2 13 Control Circuit 1 400V ...
Page 32: ...32 62 Picture 2 14 Control Circuit 2 400V ...
Page 33: ...33 62 2 3 3 Components Layout 400V Picture 2 15 Components Layout 400V ...
Page 35: ...35 62 2 3 5 Main Electrical Circuit 230V Picture 2 16 Main Electrical Circuit 230V ...
Page 36: ...36 62 2 3 6 Control Circuit 230V Picture 2 17 Control Circuit 1 230V ...
Page 37: ...37 62 Picture 2 18 Control Circuit 2 230V ...
Page 38: ...38 62 2 3 7 Components Layout 230V Picture 2 19 Components Layout 230V ...