41(65)
3. Installation and Debugging
Read through this chapter before installation.
Must abide by the following installation steps to avoid personnel injuries
or damage of the machine!
Take great care of handing the blades because they are very sharp and
may cause cutting injuries!
Power supply of the machine should be handled by qualified electricians!
Be careful!
Cutting blades must be put balanced, prevent it to rotate itself when do
the installation. Keep hands from blades to avoid body injuries!
Attention:
Don't take other person's help to finish the installation, use a wooden
board to block the rotating blade to finish it.
Notice!
Use protective gloves since the blades are very sharp.
Caution!
Must use new screw and washer to install the blade.
Summary of Contents for SG-24T
Page 1: ...SG 24T Screenless Granulator Date Apr 2013 Version Ver B English...
Page 2: ......
Page 8: ...8 65...
Page 25: ...25 65 2 3 3 Cutting Chamber and Blade Rest Picture 2 5 Cutting Chamber and Blade Rest...
Page 29: ...29 65 2 4 Electrical Diagram 2 4 1 Main Circuit 400V Picture 2 9 Main Circuit 400V...
Page 30: ...30 65 2 4 2 Control Circuit 400V Picture 2 10 Control Circuit 400V...
Page 31: ...31 65 2 4 3 Electrical Components Layout 400V Picture 2 11 Electrical Components Layout 400V...
Page 34: ...34 65 2 4 5 Main Circuit 230V Picture 2 12 Main Circuit 230V...
Page 35: ...35 65 2 4 6 Control Circuit 230V Picture 2 13 Control Circuit 230V...
Page 36: ...36 65 2 4 7 Electrical Components Layout 230V Picture 2 14 Electrical Components Layout 230V...
Page 40: ...40 65 2 5 4 Proportional Valves Picture 2 18 Control Cabinet and Valve...