48(77)
2.6.1.4 Conveyor Belts Feeding Installation
Refer to manual carefully before operate conveyor belt feeding system.
All electrical connection should be conducted by professional
electricians.
2.6.1.5 Control Circuit Connection and Operation
Conveyor belt can be solely controlled or can be controlled with single-shaft
shredder by a control station. In solely controlling, connect power and start/stop
machine via start button in conveyor belt. Note: upon delivery, conveyor belt is
controlled plus shredder and power connector of belt is covered with waterproof
plug, which should be dismantled if solely control. In connecting with shredder,
conveyor belt is separate from host machine and belt does not connect
shredder. Therefore, before shredder servicing, connect power of conveyor belt
to the plug in right door of control cabinet.
Attention!
Turn start switch of conveyor belt on if adopting this type of controlling.
Start-up and shutdown
In sole control, control belt start/stop via start and stop buttons in conveyor belt.
In combined control, control belt start/stop via select switch in master control
station.
2.6.1.6 Checkup of Conveyor Belt
Refer to CB Manual for Details.
Summary of Contents for SGS-6080S
Page 1: ...SGS S Single shaft Shredders Date May 2014 Version Ver B English...
Page 2: ......
Page 8: ...8 77...
Page 24: ...24 77 2 3 3 Cutting Chamber Structure Picture 2 8 Cutting Chamber Structure...
Page 31: ...31 77 2 3 12 Pushing Device Assembly Picture 2 12 Pushing Device Assembly...
Page 37: ...37 77 2 4 Wiring Diagram 2 4 1 Wiring Diagram Picture 2 16 Wiring Diagram...
Page 38: ...38 77 2 4 2 Control Wiring Diagram Picture 2 17 Control Wiring Diagram 1...
Page 39: ...39 77 Picture 2 18 Control Wiring Diagram 2...
Page 40: ...40 77 2 4 3 Electrical Components Layout Picture 2 19 Electrical Components Layout 1...
Page 41: ...41 77 Picture 2 20 Electrical Components Layout 2...