52(77)
3.5 Installation of Main Cutter Shaft and Bearing
1) Use hoist to lift shaft to installing port of cutting chamber, then push it inwards
after match two ends.
2) Press bearing into mounting ring.
3) Place mounting ring into cutter shaft, use tool to press bearing inner race to
mounting place, then match ring hole sites and screw bolts and lock.
Attention: apply lubricating oil to bearing and mounting ring.
4) Mount bearing end cap and lock it up with bolts.
Picture 3-4: Installation of Main Cutter Shaft and Bearing
3.6 Installation of Pulley, Motor and Reduction Gear
1) Put key into keyway of cutter shaft, use hoist to lift reduction gear, insert
output hole into shaft, then screw bolts to drag reduction gear in a proper
place; after install, make sure gear can rotate smoothly.
2) During installing torque arm, make point of connection being vertical with
output shaft axis, deviation is
±
5
o
.
3) After reduction gear installing, mount pulley on input shaft of gear.
Picture 3-5: Installation of Main Cutter Shaft and Bearing 1
Summary of Contents for SGS-6080S
Page 1: ...SGS S Single shaft Shredders Date May 2014 Version Ver B English...
Page 2: ......
Page 8: ...8 77...
Page 24: ...24 77 2 3 3 Cutting Chamber Structure Picture 2 8 Cutting Chamber Structure...
Page 31: ...31 77 2 3 12 Pushing Device Assembly Picture 2 12 Pushing Device Assembly...
Page 37: ...37 77 2 4 Wiring Diagram 2 4 1 Wiring Diagram Picture 2 16 Wiring Diagram...
Page 38: ...38 77 2 4 2 Control Wiring Diagram Picture 2 17 Control Wiring Diagram 1...
Page 39: ...39 77 Picture 2 18 Control Wiring Diagram 2...
Page 40: ...40 77 2 4 3 Electrical Components Layout Picture 2 19 Electrical Components Layout 1...
Page 41: ...41 77 Picture 2 20 Electrical Components Layout 2...