55(77)
then tighten screws to fasten the frame.
3) Mount air spring between left side plate and frame, then insert cotter pin.
4) Pull down and close the frame, screw bolts at two sides. Firstly loosen sets
crews of screen and frame then tighten them again.
Warning!
Before change screen and tighten screws at twp ends of frame, make
sure loosen screws on frame then tighten them, otherwise it will cause
loosening of two ends in screen.
Picture 3-9: Sieve Net and the Installation of a Screen
3.9 Connection of Hydraulic System
Connect hydraulic oil pipeline based on drawing, use pipe clamp to fasten oil
pipelines.
There is level indicator of hydraulic oil behind machine to observe oil content.
(note: oil levee should reach the top of indicator)
Open hydraulic pump shield before maintain and adjust hydraulic
system.
3.10 Power Connection
Power connection of granulator must be accomplished by professional
electricians!
Open hydraulic pump shield during connecting power line, then pass
Summary of Contents for SGS-6080S
Page 1: ...SGS S Single shaft Shredders Date May 2014 Version Ver B English...
Page 2: ......
Page 8: ...8 77...
Page 24: ...24 77 2 3 3 Cutting Chamber Structure Picture 2 8 Cutting Chamber Structure...
Page 31: ...31 77 2 3 12 Pushing Device Assembly Picture 2 12 Pushing Device Assembly...
Page 37: ...37 77 2 4 Wiring Diagram 2 4 1 Wiring Diagram Picture 2 16 Wiring Diagram...
Page 38: ...38 77 2 4 2 Control Wiring Diagram Picture 2 17 Control Wiring Diagram 1...
Page 39: ...39 77 Picture 2 18 Control Wiring Diagram 2...
Page 40: ...40 77 2 4 3 Electrical Components Layout Picture 2 19 Electrical Components Layout 1...
Page 41: ...41 77 Picture 2 20 Electrical Components Layout 2...