68(77)
6.
Maintenance and Repair
1. Check the condition of nylon bars. Period: Monthly
2. Check the condition of the screen. Period: Monthly
3. Check the wear and tightness condition of the blades. Period: Monthly
4. Check the lubrication of bearing, gear and reduction motor.
Period: Semiyearly
5. Check all the safety switches. Period: Weekly
6. Check the belt pulley. Period: Semiyearly
7. Check the material pushing device. Period: Weekly
8. Check whether the anti-vibration device is lossened, if yes, tighten the screw
nut on it.
9. Check the condition of the belt and belt tension. Period: Weekly
10. Check the hydraulic oil and system pressure. Period: Daily
Check whether there is leakage in the hydraulic system. Period: Weekly
Check the hydraulic system elements and oil quality. Period: Semiyearly
11. Check the start/stop button. Period: Daily
12. Check the emergency switch. Period: Daily
13. Check the main power switch. Period: Daily
14. Check the wire terminal of the electrical elements. Period: weekly
Summary of Contents for SGS-6080S
Page 1: ...SGS S Single shaft Shredders Date May 2014 Version Ver B English...
Page 2: ......
Page 8: ...8 77...
Page 24: ...24 77 2 3 3 Cutting Chamber Structure Picture 2 8 Cutting Chamber Structure...
Page 31: ...31 77 2 3 12 Pushing Device Assembly Picture 2 12 Pushing Device Assembly...
Page 37: ...37 77 2 4 Wiring Diagram 2 4 1 Wiring Diagram Picture 2 16 Wiring Diagram...
Page 38: ...38 77 2 4 2 Control Wiring Diagram Picture 2 17 Control Wiring Diagram 1...
Page 39: ...39 77 Picture 2 18 Control Wiring Diagram 2...
Page 40: ...40 77 2 4 3 Electrical Components Layout Picture 2 19 Electrical Components Layout 1...
Page 41: ...41 77 Picture 2 20 Electrical Components Layout 2...