74(77)
Picture 6-4
:
Anti-vibration Device
6.4 Maintenance
Please make sure that there is no raw material in the granulator while executing
maintenance.
Notice
!
All maintenance work must be finished by professional personnel in
order to avoid human injury and machine damage.
6.4.1 Daily Inspection
1) Once startup, check if hydraulic pressure is normal and oil is enough is oil
tank (amounts to 70%).
2) Inspect if emergency switch is normal and stop the machine immediately after
turn on the machine. Rotate the button along the arrow direction, namely,
counterclockwise direction, to reset it.
6.4.2 Weekly Inspection
1) Inspect if power wire is wear or damaged. Replace with new one if any
damage.
2) Inspect safety switch.
3) Inspect if baffle nylon bar of pushing block and baffle iron are lose. Fix screws
if they are loosened.
6.4.3 Monthly Inspection
1) Inspect if belt is wear and inspect belt tension every 6 month.
2) Inspect if blades and their fixing screws are loosened.
3) Inspect wear condition of baffle nylon bar, adjust it to make it fit with bottom
Summary of Contents for SGS-6080S
Page 1: ...SGS S Single shaft Shredders Date May 2014 Version Ver B English...
Page 2: ......
Page 8: ...8 77...
Page 24: ...24 77 2 3 3 Cutting Chamber Structure Picture 2 8 Cutting Chamber Structure...
Page 31: ...31 77 2 3 12 Pushing Device Assembly Picture 2 12 Pushing Device Assembly...
Page 37: ...37 77 2 4 Wiring Diagram 2 4 1 Wiring Diagram Picture 2 16 Wiring Diagram...
Page 38: ...38 77 2 4 2 Control Wiring Diagram Picture 2 17 Control Wiring Diagram 1...
Page 39: ...39 77 Picture 2 18 Control Wiring Diagram 2...
Page 40: ...40 77 2 4 3 Electrical Components Layout Picture 2 19 Electrical Components Layout 1...
Page 41: ...41 77 Picture 2 20 Electrical Components Layout 2...