Installation
Ensure the power has been turned off before beginning this installation
To install this hood you will require
two assistants.
You will need the following tools and
material to complete this installation:
*Drill*Flat head screwdriver*Phillips
head screwdriver or cordless drill and
Phillips head bit*Tin snips*3/8''nut
driver or ratchet with extension*measuring
tape*hand saw or jig saw*electrical tape*
duct tape
。
1. Remove the range hood from the carton.
2. Lay the hood upside down on a table
covered with cardboard or paper to prevent
scratching of the table or hood.
3. Hood installation should be within 0.8m
radius range.
4. We recommend that after installation the
bottom of the hood should be no less than
700mm and no more than 750mm above
the stove's heating elements and burners.
Information
Installation
work
and
electrical
wiring
must
be
done by qualified
person(s)
in
accordance with all
applicable
codes
and
standards,
including fire rated
construction
i
8