1. Place ring
handle on the
outside of the
door and right
hand garage
door making
sure you are
central to the
framework
running across on the other side. Mark posi-
tion of holes. Join the holes with a marker to
find the centre, then drill centre point only.
2. Place the wooden handle on the inside of
the door and garage door and screw from the
outside using the hole just drilled using 1 x 45
mm flat head screw.
3. Fit the ring handle using 4 x 25mm black
screws.
4. Fit the false hinges to the outside of the
doors, 3 for main door and two per garage
door. Each is to fit as far as possible onto the
framework at the back of the door. Secure
using 2 x 25 mm black screws and along the
length of the hinge 2 x 10 mm black screws
per hinge.
5. Mark on the inside of the door approx.
25 mm from the edges and also from the
points of the diamond cut out, 8 marks in
total. Drill at marks (4mm drill bit).
6. Place two of the wooden angled rebated
pieces flush with the edge of the diamond
shaped cut out. Secure from the back using
holes just drilled using 4 x 20 mm screws.
7. Remove protective film from both sides of
the door glazing material.
8. Slide in the glazing then fit the remaining
two angled rebated pieces to the top using 4
x 20 mm screws.
Remove all travel protection blocks from
bottom edge of panels.
1. Ensure that your base is firm and
absolutely level.
2. Lay floor of building on base.
3. Pre drill panels in 3 places, top, middle and
bottom.
4. Place back panel onto
floor ensuring the cladding
has overhung the floor.
The front and back panels
extend from floor edge to
floor edge.
5. Place side in position and join to back
panel from the inside using 3 x 60 mm
screws.
6. Place other side panel next to back panel
and join together from the inside using 3 x 60
mm screws
.
7. Place front panel in position and join to
side panels from the inside using 3 x 60 mm
screws per side.
1. Take one piece of the first floor support
framework and place along the top of the
double windows of the front panel and secure
using 3 x 60 mm screws.
2. On the opposite panel measure and mark
from the floor 1018 mm onto the upright. This
is where the bottom of the other support for
the upstairs floor will be situated. Secure
using 1 x 60 mm screw into the upright and
an ‘L’ shaped bracket in the corner using 2 x
25 mm screws.
3. Place the upstairs floor onto the supports
and secure up through each support into the
floor using 2 x 60 mm screws each end.
Secure through floor into the upright that runs
centrally above the double doors using 1 x 60
mm screw.
4. Place the upstairs railing against the floor,
mark the upright where it meets the top of the
back panel. Cut at this point to leave an
angled edge.
5. Secure the ladder to the upstairs floor
using 3 x 60 mm screws, the ladder should be
situated next to the back panel.
6. Place the railing back against the floor
between the ladder and the front panel, the
slats face the upstairs. Secure through
bottom of railing into upstairs floor using 3 x
60 mm screws. Secure through side of railing
into upright on front panel using 2 x 60 mm
screws.
A Door Preparation
B Floor & Walls
C Upstairs