background image

 

19

 

Roof 

(A5004)x01 

  

  GB-IE 

Position the 

A5004 Roof 

so the bearers with gaps are positioned with the gap over both ends cladding 

and tight to the front wall. 

Drill and fix the up the gable slopes into the bearers.  

Drill through the front bearer and screw into the front. 

08 

  

  GB-IE 

 

From the outside drill 4 places inline with the wall and fix with 60mm screws. 

TIP– use a chalk line or string to mark the drill line. 

09 

60mmScrew 

(A0035)x04 

60mmScrew 

(A0035)x05 

5 mm  

5 mm  

Roof bearer with 

gap each end 

109mm 

Roof bearer with 

gap each end 

Summary of Contents for Paradise Bar

Page 1: ... Paradise Bar 6x4 Version 1 051 025 2020 Julian Shepherd These instructions are for your safety Please read through them thoroughly before use PLEASE KEEP THIS LEAFLET FOR FUTURE REFERENCE WEIGHT 165kg ...

Page 2: ... Для получения копии инструкции или копия на другом языке пожалуйста отправьте по электронной почте или написать по указанному ниже адресу TR Başka bir dilde talimatları veya bir kopyasını bir kopyası için bir e posta gönderebilir veya aşağıdaki adrese yazınız EN For a copy of the instructions or a copy in another language please send an email or write to the address below I Per richiedere una cop...

Page 3: ...embly Only use child and animal safe wood preservative Do not use creosote Allow the wood preservative to fully dry before use Regularly check the building for wear and tear Getting Started GB IE EVERY PRECAUTION IS TAKEN TO ENSURE THAT YOUR BUILDING HAS NO ELEMENT INCORRECTLY PLACED OR POSSIBLY HAZARDOUS HOWEVER PRIOR TO USE PLEASE CHECK ALL SURFACES FOR THE FOLLOWING 1 RAISED GRAIN SPLINTERS San...

Page 4: ...ly prior to or after assembly The building must have been re treated and re sealed annually NOTE Wood is a natural product and therefore the following are excluded from the warranty Colour change Warping Splitting Preparation of base We recommend that the base onto which your building will stand should be at least 75mm larger in each direction than the total floor size of the building Actual floor...

Page 5: ... 6 golden rules of maintenance 1 Timber widely recycled 2 Metal fixings widely recycled 3 Glass widely recycled 4 Roofing felt not currently recycled packaging Building 1 Ensure your base is level and firm 2 Ensure the building is not sitting directly on the ground using damp proof membrane or the optional timber base 3 Ensure every piece of timber and surface especially that is hidden upon assemb...

Page 6: ...Stacked Parts List Scale 1 70 unless stated Description part No Qty 06 ...

Page 7: ...Fascia Bag Parts List no scale Description part No Qty 07 ...

Page 8: ...25 x30 40mmRound head nail A0032 x16 25mm Posi drive screw A0035 x38 60mm Posi drive screw Nail bag contents Description part No qty 13 A0023 x96 13mmFelt Nail A0031 x12 Posi drive screw Black 25mm A0033 x04 40mm Posi drive screw 40 ...

Page 9: ... You will need Hammer Spirit level Ladder 1mm 3mm 5mm 8mm drill bits Drill Tape measure Ruler Sand paper Gloves Saw Pencil Goggles A helper for some tasks Screwdriver Sharp knife Masking tape When you see the drill icon Only ever drill through the first piece of framework which will be a pilot hole for the screw to attach the second piece of framework The required drill bit size is shown with the ...

Page 10: ...10 In more detail GB IE ...

Page 11: ...11 In more detail GB IE ...

Page 12: ...on We have used concrete for our example Make sure the floor is situated as shown The open long side of the floor is the front Door Panel A5003 x01 02 Front Floor panel A0085 x01 GB IE Fit the lock bar and handles to the doors and unlock the door The Key is usually screwed to the panel or in the nail bag Unlock the door and keep the key safe Front 25mm Black Screw A0031 x04 Black Knob set A2888 x0...

Page 13: ... handles A0089 to the outside of the shutter so the 25mm black screws go into the framework Fix a A0014 Bolt at each corner framework with 4x25mm screws each 03 D handle A0089 x02 Bolt A0014 x04 25mm Black Screw A0031 x08 25mmScrew A0032 x16 ...

Page 14: ...the floor and the cladding overhangs the floor Push the Plain end A5005 up to it and ensure both panels are tight to the floor and the framework is flush before fixing Do not screw to the floor yet 04 If using a drill or electric screwdriver carefully but firmly push the opposite end to the screwdriver bit into the screw head and keep the pressure on to prevent the screwdriver spinning in the scre...

Page 15: ...or Panel A5003 x01 GB IE Again drill holes in both sides and the bottom of the door panel although only 3 holes are for this step Position the A5003 door panel flush and true as before Fix to the back with 3x 60mm screws 05 5 mm ...

Page 16: ... to the floor with the 10 holes drilled previously 07 GB IE The A2423 front panel needs no holes in the end framework Again the bottom edge must be drilled inline with the floor framework Like the back the front fits in front of the sides and runs the length of the floor Fix using the holes drilled in steps 4 5 06 60mmScrew A0035 x06 60mmScrew A0035 x10 5 mm ...

Page 17: ...d fix the up the gable slopes into the bearers Drill through the front bearer and screw into the front 08 GB IE From the outside drill 4 places inline with the wall and fix with 60mm screws TIP use a chalk line or string to mark the drill line 09 60mmScrew A0035 x04 60mmScrew A0035 x05 5 mm 5 mm Roof bearer with gap each end 109mm Roof bearer with gap each end ...

Page 18: ...folding the felt over the roof edging level with the bottom edge and the same at one end with the excess at the other end Secure with a couple of nails at the top and ends to hold the felt in position On the back edge nail at approximately 100mm centres 10 Tidying the corner 13 13mm Felt nails A0023 x32 ...

Page 19: ...the roof frame 12 GB IE Measure how far the first piece of felt comes up the roof and mark this distance from the front Position the second piece of felt so it overlaps the bottom strip and the measurement mark evenly Nail at approximately 100mm centres at the lower edge and four at the top and sides to hold 11 2 0m Felt strip A2433 x01 13 13mm Felt nails A0023 x32 2 0m Felt strip A2433 x01 13 13m...

Page 20: ... the A2427 A2428 braces Place some masking tape below the opening in the front at each outer edge and mark and drill two holes either side as dimensioned below Align the braces flush with the opening and fix from the inside 13 LH brace A2428 x01 3mm 40mmScrew A00033 x04 40 ...

Page 21: ...ch bolt with a pencil Drill a hole 8mm diameter about 20mm deep for each one 15 GB IE Place the A2429 bar shelf on top of the braces and into the aperture of the front panel so the framework is flush Screw through the front panel using the holes drilled earlier and then through the braces 14 5 mm 8 mm Sutter A2439 x01 ...

Page 22: ...22 GB IE Fit cover strips at each corner with 4 nails each 16 40mm Nail A0025 x16 Cover strip A2436 x02 46mm Cover strip A2575 x02 46mm ...

Page 23: ...Drill the fascia with a 1 mm drill to stop splitting Fix each side fascia with 4 nails each and four nails for the front fascia 17 40mm Nail A0025 x14 Side Fascia A5526 x02 Front Fascia A5525 x01 70mm 12mm 70mm 12mm ...

Page 24: ...Building Photographs It will be greatly appreciated if you could forward images of your completed building to sales shiregb co uk ...

Reviews: