background image

C                                                                                                18/01/2011                                           J Shepherd 

 

 

fig19 

3 Window units  are fitted as above       
fig 20) when you have built up to the 
correct height 

 

Fig 20 

4 Note Door and window units do not 
require fixing 

5. Slide all pieces between door and 
window into place from above. 
6 Once the door and window units are 
in place continue assembling the walls 
as before but slide the logs into the door 
or window frame (fig  21) from above 
then tap them down. 

 

Fig 21

 

 

1 Once gables are in place knock down 
all the walls again as in fig 16 to ensure 
all the walls are fully home 
2 Fix the gable with1x80mm screw at 
each end (fig 22.) 

 

Fig 22 

 

1 Fit roof bearers into slots provided  in 
the gable sections (fig 23 & 24). 

 

 

Fig 23 

2 Measure the distance between each 
roof bearer and the roof bearers and 
walls to ensure all components are fully 
home before continuing. 

 

Fig 24 

3 Position the eaves edging strips 
( fig 25 &26) level at both ends with the 
gable angle (front and back walls) and 
screw  to the wall with 50mm screws at          
approximately 400 centres. 

 

Fig 25 

 

Fig 26 

4 The first roof board is now ready to 
be positioned (fig 27).

 

Fig 27 

5 Start at the front, place the board level 
with the end of the roof bearers and 
central over the middle bearer to pro-
duce an even overhang (fig 27). 
6 Fix into place at the roof bearers and 
angled eaves edgings using two 40mm 
nails at each bearer & eaves edging 

 

Fig 28

 

7 The final roof board will need to be 
cut. Place it in position and measure the 
distance between the end of the roof 
bearers and the edge of the board. This 
will tell you how much you need to cut off 
(fig28). 
8  Next fit the roof edgings to the sides of 
the building with 50 mm screws at 
 approximately 300mm centres (Fig. 29). 

 

Fig 29 

 

see drawing pages 1& 2  

2 space out the floor bearers (319mm 
between ) with the widest side to the 
floor.  
3. place the first deck board on top of the 
boards ( fig 30 )and ensuring that it is 
flush and true  with the bearers screw at 
each bearer with 2 x 50mm screws. 

 

Fig 30 

4 To prevent finger entrapment use a £1 
coin as a spacer (less than 5mm) (fig 
31 ) fix the rest of the deck boards as 
before. 

 

Fig 31 

5. slide into position . 

 

 1 One 10m -roll of felt has been      
supplied, 

 

Fig 32 

2 measure the length of the roof (fig 32) 
and add 100 mm to that length . This  
length is used  to cut 3 strips from the 
roll. (fig 33)  

.  

Fig 33 

3 use a piece of floorboard as a guide to 
cut the felt. (fig 34) 

 

Fig 34 

4 measure up 966mm and mark  (fig 35) 
at the front and back of each side of 
( and along ) the roof.    

 

Fig 35 

 5  Starting at the lower edge (eaves) 
place 1 piece of  felt from front to back of 
the building 
6 An overhang of approximately 100mm 
should be allowed at the front and the 
back (all felt strips) and the length of the 
eaves edgings at the side (Fig 36). 
7 line up the felt at the marks (step 4) 
leaving enough for a 50mm overhang 
( fig 36)then  Secure with felt nails at           
approximately 100mm spacing. But only 
a couple along the high edge at this time 
(nailed with overlap). 

 

Fig 36 

.8 Repeat on the other side.                     
9.  Place the last piece across the ridge. 
(high point ) Evenly overlap the other 
pieces of felt (fig 37 ) . then nail as  
before. 

 

Fig 37

 

Fig 38 

10. 8 On the underside of the outside 
corners (fig 38 ) neatly cut, fold and 
secure using 1x felt nail. 
 11. Nail with felt nails at each roof 
bearer leaving space for fixing the   
fascias.

Gables

 

G Roof assembly

 

H Verandah floor

 

I Felt roof 

 

Reviews: