Automatic Tool Changer (ATC) Installation Manual • December 1, 2016
© Copyright 2016 ShopBot Tools, Inc.
page 10
Level the tool bar by placing a level on the fixed Z zero
plate (pre-attached to tool bar), then securely tighten all
5/16” button heads in tool bar mounting bracket.
Mount Tool Chuck
The tool chuck is used to hold the tool holder cone while changing
collets and bits. Use 5/16x3/4” button head screws and T-nuts to
mount the tool chuck in the second slot from the bottom of the ta-
ble extrusion. If this location is not optimal, mount the chuck where
it is most convenient.
Mount Main Air Assembly
Mount the pneumatics in the bottom extrusion slot
on the back table side. Ensure the pneumatics are
positioned as close to center of the table as possible.
Secure pneumatics with two 5/16x3/4” button head
screws and 5/16” T-nuts.