Automatic Tool Changer (ATC) Installation Manual • December 1, 2016
© Copyright 2016 ShopBot Tools, Inc.
page 15
Connect two pieces of 5/32” tubing to the bottom
two push-in connectors on the manifold.
Route the other end of the tubing to the front side of
the spindle. Trim tubing to length.
Connect the 5/32” tubing from the left hand manifold
connection (as facing the back of the machine) to the
rear dust skirt connection (as facing the front of the ma-
chine).
Connect the 5/32” tubing from the right hand manifold
connection (as facing the back of the machine) to the
front dust skirt connection (as facing the front of the
machine).
Connect the main air supply to the filter and regulator assembly
with a standard air line that has a 1/4” female quick disconnect
(not supplied).
Attach the air hose to the male end of the disconnect, located on
the left of assembly.