Automatic Tool Changer (ATC) Installation Manual
●
July 23, 2018
© Copyright 2018 ShopBot Tools, Inc.
page 21
Place the red calibration clip on the bottom of the inverted
tool holder in position #1.
Click OK to make the Z-axis move down and touch off the inverted tool holder and then raise up to a safe
distance and move back towards Y=0.
Click “OK” to continue.
Press the green button to remove the empty tool holder in the spindle.
Caution: Grasp the tool holder before pressing the green button.
Step 2: Determine XY Position of Tool Clips
Snap the 1/4” collet into the collet nut, then screw the assembly onto the tool holder. Insert the 1/4” drill rod
into the collet and tighten. Press the green button to place the tool holder with the drill rod back into the
spindle.
Clip the black grounding clip to the top of the drill rod and the red calibration clip to the bottom of the
inverted tool holder.
Use the keypad to lower the Z-axis so that the drill rod is about 1/4” below the plane of the inverted tool
holder. Make sure that the grounding clip is not between the drill rod and the side of the tool holder.
Note:
This should only be a move in the Z-axis so that the tip of the drill rod is below the top edge of
inverted clip. Do not move X or Y axes.