LED Flood EX36
4
Take care with the power cable. Never pull the power cable to remove the plug from
the receptacle, be sure to hold the plug.
When not using the unit for an extended period of time be sure to disconnect the
plug form the receptacle.
1.1
. Overhead Rigging
This item must be built in a way that it can hold 10 times more of its weight for 1
hour without causing any damages. The installation must be secured with a
secondary safety attachment. The Safety attachment has to be constructed in a way
that no part of the installation can fall down. When rigging, de-rigging or servicing
the fixture staying in the area below the installation place, on bridges, under high
working places and other endangered areas is forbidden. Before taking the device in
operation, the installation must be approved by an expert. The operator has to make
sure that safety-relating and machine-technical installations are approved by a skilled
person once a year.
IMPORTANT! OVERHEAD RIGGING REQUIRES EXTENSIVE EXPERIENCE.
Including (but not limited to) calculating working load limits, installation material
being used, and periodic safety inspection of all installation material and the
projector. If you lack these qualifications, do not attempt the installations yourself,
but instead use a professional structural rigger. Improper installation can result in
bodily injury and/or damage to property.
Use only professional trussing system if the item shall be lowered from the ceiling or
high joists. Never let the device swing freely in a room.
CAUTION: Overhead Items may cause serious injuries!! If there is concern about the
safety then DO NOT INSTALL the device.