Remove all packing materials from the PSA-16A3C. Check if all foam and plastic padding is removed. 
Screw the equipment into a 19-inch rack. Connect all cables. 
 

Always disconnect from electric mains power supply before cleaning or servicing. 
Damages caused by non-observance are not subject to warranty.  

 

Set Up and Operation 

 

When mounting the Showtec PSA-16A3C in a rack, make sure that air flow is not obstructed. 

 

Always check the mains voltage before connecting the unit. 

 

Do not use the main MCBs to switch power on outputs. Toggle the units only when the system is in 
idle state. 

 

Switch MCBs to ON position only once all the devices have been connected to the outputs. 

 

 

Before switching the device on, make sure that the power source is equipped with 

its own RCCB protection system. 

 

 
 

Maintenance 

The operator has to make sure that safety-related and machine-technical installations are to be 
inspected by an expert after every year in the course of an acceptance test. 
The operator has to make sure that safety-related and machine-technical installations are to be 
inspected by a skilled person once a year. 
 

We strongly advise you to let a qualified technician give the unit a maintenance check twice a year. 

The following points have to be considered during the inspection: 
01)

 

All screws used for installing the device or parts of the device have to be tightly connected and 
must not be corroded. 

02)

 

There may not be any deformations on housings, fixations and installation spots. 

03)

 

The electric power supply cables must not show any damages or material fatigue. 

 

The Showtec PSA-16A3C requires almost no maintenance. However, you should keep the unit clean.  

01)

 

Disconnect the mains power supply, and then wipe the cover with a damp cloth. Do not immerse in 
liquid. Do not use alcohol or solvents. 

02)

 

Please clean internal components twice a year with a light brush and vacuum cleaner.  

03)

 

Keep connections clean. Disconnect electric power, and then wipe the connections with a damp 
cloth. Make sure connections are thoroughly dry before linking equipment or supplying electric 
power. 

04)

 

Check and tighten all screws, especially the screw terminals.

 

05)

 

The electric power supply cables must not show any damages or material fatigue. 

 

Troubleshooting 

This troubleshooting guide is meant to help solve simple problems. If a problem occurs, carry out the steps 
below in sequence until a solution is found. Once the unit operates properly, do not carry out the 
following steps. 
01)

 

If the device does not operate properly, unplug the device. 

02)

 

Check power from the wall and all cables. 

03)

 

Plug the unit in again. 

04)

 

If nothing happens after 30 seconds, unplug the device. 

05)

 

Return the device to your Showtec dealer. 

 

 

Summary of Contents for 50660

Page 1: ...PSA 16A3C V1 Highlite International B V Vestastraat 2 6468 EX Kerkrade the Netherlands Ordercode 50660 MANUAL ENGLISH...

Page 2: ...Instructions 2 Operating Determinations 4 Connection with the Three Phase Power Network 4 Return Procedure 5 Claims 5 Description of the device 6 Frontside 6 Backside 7 Installation 8 Set Up and Opera...

Page 3: ...ox and packing Your shipment includes Showtec PSA 16A3C User manual Safety Instructions Every person involved with the installation operation and maintenance of this device has to be qualified follow...

Page 4: ...exposed to extreme heat moisture or dust Make sure that the available voltage is not higher than stated on the rear panel Make sure that the power cord is never crimped or damaged Check the device and...

Page 5: ...Any other operation may lead to dangers like short circuit burns electric shock crash etc You endanger your own safety and the safety of others Connection with the Three Phase Power Network Connect t...

Page 6: ...ber 04 A brief description of the symptoms Claims The client has the obligation to check the delivered goods immediately upon delivery for any short comings and or visible defects or perform this chec...

Page 7: ...to the three phase mains Make sure that the total load connected to the PSA 16A3C does not exceed 16A per phase The CEE input should be connected to the power source which is equipped with its own RCC...

Page 8: ...side should not exceed 16A per phase 11 CEE L2 Output 3 pin CEE socket Maximum load 1x 16A per socket Total load for both sockets on L2 together should not exceed 16A per phase 12 CEE L2 Output 3 pin...

Page 9: ...s have to be considered during the inspection 01 All screws used for installing the device or parts of the device have to be tightly connected and must not be corroded 02 There may not be any deformat...

Page 10: ...0V AC 50 60Hz Circuit breaker 3 x 1 pin 16A C Type Electro mechanical effects IP rating IP20 Housing Powder coated metal Rated current 16A Breaking capacity 6kA Color Dark grey Voltage and amperage in...

Page 11: ...10 Ordercode 50660 PSA 16A3C...

Page 12: ...2016 Showtec...

Reviews: