8
Ordercode: 50665
Showtec PSA-32A12M
16)
Schuko output
Maximum load 16A. Total load for all sockets on L3 together should not exceed 32A per phase.
17)
Power input
Connect to the three phase mains. Be sure the total load connected to the PSA-32A12M does not
exceed 32A per phase. You can use the built-in ampere meters to check.
Schematic Overview
Installation
Remove all packing materials from the PSA-32A12M. Check if all foam and plastic padding is removed.
Screw the equipment into a 19-inch rack. Connect all cables.
Always disconnect from electric mains power supply before cleaning or servicing.
Damages caused by non-observance are not subject to warranty.
Set Up and Operation
When mounting the Showtec PSA-32A12M in a rack, make sure that air flow is not obstructed.
Always check the mains voltage before connecting the unit.
Do not use the RCCB and the MCBs to switch power on outputs. Toggle the units only when the
system is in idle state.
Switch MCBs to ON position only once all the devices have been connected to the outputs.
Before switching the device on, make sure that the power source is equipped with
its own RCCB protection system.