SR501 EN Operation Manual
- 13 -
3. System diagram
Note
: this diagram is only for reference
.
4. Functions operation
Before switching-on the power, please connect sensor of temperature and
water level, water filling solenoid valve to the input port of controller, connect
electrical heater to the output port of controller. And then switching-on power,
the controller runs an initialization phase for 5 seconds, then controller runs a
commissioning menu, it leads the user through the most important adjustment
channels needed for operating the system.