Before installing a Nano manual shade,
the spring tension must be set
. The amount of pre-tensions
required for each shade varies and can be found on the attached shade list.
1. Insert the pre-tension tool into the spring control, and rotate counter-clockwise until the correct
number of pre-tension rotations are set.
NOTE: For reverse roll shades, the
tension direction will be opposite.
Pre - Tension - Nano Roll - Manual
Pg 5
PRE-TENSION –
Nano Roll – Manual Operation
NOTE: Start with arrows and small
rib facing up.