Installation of the Analyzer Unit
EuroFID · Operating Instructions · 8011094 V2.3 · © SICK AG
45
4.3.4
Gas connections
4.3.5
Electrical connections
Connect the plug connector to the terminal box with the double cable.
On devices with the “flow barrier” option:
Connect the solenoid valve to the terminal
box (
On devices with the “fan” option:
Connect the connection cable of the fan in the
terminal box to 24 VDC (
Recommendation – to stop the gas flow on the device manually:
Fit a shut-off valve in the gas supply line.
The shut-off valves are available as a ready-made shut-off fitting (
Gas connection for
Installation work
Instr. air
Instrument
air
Observe the information on instrument air (
).
Connect the instrument air supply to the “Instr.air”
gas connection.
On devices with the “flow barrier” option:
Also connect the instrument air supply to a gas
connection of the solenoid valve.
Connect the other gas connection of the solenoid
valve to the “flow barrier” gas connection.
Fuel gas
Fuel gas
Observe the information on fuel gas (
Connect the fuel gas supply to the “Fuel gas” gas
connection.
Calibr. gas
Span gas
Provide suitable span gas (
Observe the information on span gas supply (
Connect the span gas supply to the “Calibration
gas” gas connection.
Exhaust
Exhaust gas
If it is necessary to eliminate the exhaust gas due to
the composition of the sample gas:
Connect an exhaust gas line to the “Exhaust”
connection. Suitable material: Non-corrosive hose
with an inside diameter of 6 mm.
Observe the information on installation of the
exhaust gas connections (
Summary of Contents for EuroFID
Page 10: ...Contents 10 EuroFID Operating Instructions 8011094 V2 3 SICK AG ...
Page 18: ...18 EuroFID Operating Instructions 8011094 V2 3 SICK AG Important Information ...
Page 80: ...80 EuroFID Operating Instructions 8011094 V2 3 SICK AG Start up ...
Page 88: ...88 EuroFID Operating Instructions 8011094 V2 3 SICK AG Operation General ...
Page 100: ...100 EuroFID Operating Instructions 8011094 V2 3 SICK AG Main Menu Functions ...
Page 144: ...144 EuroFID Operating Instructions 8011094 V2 3 SICK AG Maintenance Sub menu Functions ...
Page 154: ...154 EuroFID Operating Instructions 8011094 V2 3 SICK AG Calibration ...
Page 158: ...158 EuroFID Operating Instructions 8011094 V2 3 SICK AG Shutdown ...
Page 182: ...182 EuroFID Operating Instructions 8011094 V2 3 SICK AG Clearing Malfunctions ...