22
FLOWSIC100 Flare-XT · Operating Instructions · 8023761/V1-0/2020-10 · © SICK Engineering GmbH
Project planning
4.1
Overview
The following Table provides an overview of the project planning work necessary as
prerequisite for trouble-free assembly and subsequent device functionality.
Task
Requirements
Work step
Determine
measuring
and
installation
locations
Flow distribution,
inlet and outlet piping
Lowest possible influence on the
measurement accuracy
Follow specifications for new equipment;
select best possible location for existing
equipment
Access, accident
prevention
Easy and safe
Provide platforms or pedestals as required.
Installation free of
vibrations
Acceleration < 1 g
Avoid/reduce vibrations through adequate
measures.
Ambient conditions
Limit values in accordance with Technical
Data
If necessary:
Provide weatherproof covers / sun protection,
enclose or lag device components.
Select device
components
Internal pipe diameter Sender/receiver unit type
Select components according to the
Configuration Table and information as from
p. 49, §5.6.6. as well as the Application
Evaluation Sheet
Gas temperature
Sender/receiver unit type
Gas composition
Material of duct probe and transducer
Fitting locations
Cable lengths
Plan power
supply
Operating voltage,
power requirements
According to Technical Data
Plan adequate cable cross-sections and
fuses