74
FLOWSIC100 Flare-XT · Operating Instructions · 8023761/V1-0/2020-10 · © SICK Engineering GmbH
Installation FLSE100-XT
5.6.8.4
Leak tightness check
▸
After a successful leak tightness check, connect the sender/receiver units electrically,
.
NOTICE:
▸
Perform a leak tightness check with suitable means after completion of the
installation work.
▸
Also perform a leak tightness check with suitable means after completion of
the installation work with spool piece. No leakage check has been made at
the factory.
NOTICE:
Proceed as follows when leak tightness is not established:
Pull the sender/receiver units back and disconnect them from the process
.
Contact SICK Service.