Before commissioning
▸
Make a visual leak check of the enclosure (enclosure cover, cable inlet and gas inlets).
If the enclosure is deformed or damaged: Do not put the enclosure
GMS84x
into
operation and secure against unauthorized commissioning.
▸
If the enclosure was opened: Make sure the atmosphere in the enclosure is not
inflammable.
Fig. 7: Power supply unit
1
Before switching on: If work was carried out on the power supply unit: Before switching
on make sure that a correct power supply unit (compliant with CCSAUS or ATEX/IECEx)
has been installed.
2
Seal the enclosure tight,
see “Closing the enclosure tight”, page 21
3
If the enclosure has purge gas connections (option): Put the purge gas supply into
operation.
4
Put the device into operation.
WARNING: Risk of explosion
▸
Do not carry out work on the device in potentially explosive atmospheres.
▸
Only use tools approved for Ex zones.
Power supply unit