SYSTEM DESCRIPTION
3
49
8017768/12AX/2019-05-31|SICK
Subject to change without notice
O P E R A T I N G I N S T R U C T I O N S | TIC
3.6.3
General requirements at the measurement site
A
flat
road with a route as
straight
as possible is needed for use of the profiling system.
The length of the straight section before and after the measuring point is defined by the
maximum vehicle length to be checked.
Fig. 44: Project planning – measurement site (straight section)
Minimum distance
To ensure optimum measurement results, there must be a minimum distance between
vehicles passing through the measurement site. The faster the speed, the longer the
distance between the vehicles has to be.
Fig. 45: Project planning – Calculating the TIC102 / TIC502 minimum vehicle distance
TIC102 / TIC502