ELECTRICAL INSTALLATION
5
81
8017768/12AX/2019-05-31|SICK
Subject to change without notice
O P E R A T I N G I N S T R U C T I O N S | TIC
5.4
TIC502 / TIC501 electrical installation
Connect the 2D LiDAR sensors used by the TIC502 or TIC501 system functions to the
voltage supply and to the Traffic Controller using the Ethernet switch provided at the
customer site.
The Traffic Controller is used for the connection to the customer network.
Wiring overview of the TIC502
Fig. 88: Electrical installation – TIC502 wiring overview