Installation and operating instructions
AEROMAT 150
Last update: 08.2014
5
Installation
Prerequisites for installation
•
The position from which the outdoor air is drawn in must be selected in such way that any nearby emission sources have
as little impact as possible on the quality of the air being drawn in.
•
Installation options:
Installation in impost
AEROMAT 150
Installation sequence
1. Carefully remove AEROMAT 150 from the packaging. We recommend placing the unit on a soft surface (e.g. cardboard
or blanket) during installation.
2. Type DD: Close the locking plate on the front to prevent contamination (e.g. dust) from entering the unit during installati-
on.
3. Install the AEROMAT 150 in its intended installation position and seal it in accordance with the installation directives
applicable on site.
4. Check AEROMAT 150for cleanliness prior to its commissioning. If necessary, clean the unit thoroughly as described in
our operating and care instructions.