6
AEROMAT 150
Installation and operating instructions
Last update: 08.2014
Mains supply
Depending on the design, the AEROMAT 150 is connected directly to the 230-V AC mains power supply using an external switch.
Exposed electrical components.
Risk of fatal injury from electric shock or fire.
›
Work on a 230-V AC mains power supply may only be performed by a qualified electrician.
›
All work on the 230-V AC mains power supply must be carried out in compliance with the current German VDE
regulations (e.g. VDE 0100) and any relevant country-specific requirements.
›
Switch off or unscrew the fuses.
Important:
If the AEROMAT 150 is connected directly to the 230-V AC mains power supply, a mains isolator must be
installed by the customer.
›
Wire the circuit according to this circuit diagram
Connection Type DK
Connection Type AW4
PE
1
2
3
5
4
6
S1
PE
N
L1
PE
1
2
3
5
4
6
PE
N
L1
S1
S2
S3
S4
1
2
3
5
4
Switch assignment
Switch assignment
Switch position
S1 Opening and closing of the locking plate
S1 Turn system on/off
open = unit is off
S2 Opening and closing of the
locking plate
open = ventilator is
closed
S3 Changeover ventilation
(aeration/de-aeration)
open = aeration
S4 Changeover of level I / II
open = level I
Connector pin assignment
Connecting cable 7 x 0.75 ca. 1.2 m long
Protection class I, covered version, 230 V∼ max. 0.17 A
Ventilation level I = 5 W, level II = 32 W
You can connect and operate up to five AEROMAT 150 at
the same time with one blower each on one switch unit.
blue 1
brown 2
black 3
blue