IV386 Rev.000 SIEL S.p.A.
Data di emissione: 2015-10-02
Pag. 70 di 263 + FR
C
HECKING THE CONTENTS OF THE ACCESSORIES BOX
It is first necessary to check the contents after the packaging has been opened:
user manual,
“Installation Instructions”
, safety manual, test certificate, safety labels, warranty card, serial cable, door keys.
UPS
P
OSITIONING
When positioning, take into account that:
§
the wheels are only to be used for accurate positioning, so for short trips
§
plastic parts and the door are not able to act as pushing points or handles
§
leave sufficient clearance in front of and behind the device to allow for startup/shutdown and maintenance
§
no objects should rest on the upper part of the UPS
OR FURTHER INFORMATION, REFER TO THE INCLUDED “INSTALLATION INSTRUCTIONS”
Once the UPS is in place, secure it with its feet (see
"UPS front view"
).
If necessary, you can reuse the pallet brackets to anchor the UPS to the floor (see figure below). These brackets are not
necessary in normal conditions.