1.4 EQUIPMENT DELIVERY AND HANDLING
1.4.1 Factory Shipment
Prior to shipment, a controller is fully tested and inspected to ensure proper operation. It is then packaged for
shipment. Most accessories are shipped separately. Shown below are some of the items shipped with a controller.
Actual items included in a shipment will depend upon controller model number. A printed copy of the 353
Installation Guide, IG353-1 is also supplied.
1.4.2 Receipt of Shipment
Inspect each carton at the time of delivery for possible external damage. Any visible damage should be immediately
recorded on the carrier’s copy of the delivery slip.
Carefully unpack each carton and check the contents against the enclosed packing list. Inspect each item for any
hidden damage that may or may not have been accompanied by exterior carton damage.
If it is found that some items have been damaged or are missing, notify the Process Instrumentation Division of
Siemens Energy and Automation immediately and provide full details. In addition, damages must be reported to the
carrier with a request for their on-site inspection of the damaged item and its shipping carton.
1.4.3 Storage
If a controller is to be stored for a period prior to installation, review the environmental specifications in Section 13
Model Designation and Specifications.
1.4.4 Typical Shipment Contents
The items listed below are those typically included in a shipment and are subject to change.
1.
Siemens 353 Process Automation Controller, model number per order, qty. 1
2.
MMC or MMC
plus
™ memory card (inserted in MMC socket on MPU Controller board), qty 1
3.
Power Input and Range Resistor Kit, PN 16354-30, qty. 1
Literature CD
Crimp on
Connectors
Case Rear
Terminals
Rear
Terminal
Cover
Case Mounting
Clips
Range
Resistors
Summary of Contents for 353
Page 12: ...Contents UM353 1B x April 2012 ...
Page 22: ...Introduction UM353 1B April 2012 1 10 ...
Page 30: ...Configuration Overview UM353 1B April 2012 2 8 ...
Page 122: ...Function Blocks UM353 1B April 2012 3 92 ...
Page 168: ...Data Mapping UM353 1B April 2012 6 28 ...
Page 204: ...Controller and System Test UM353 1B April 2012 9 8 ...
Page 222: ...Calibration UM353 1B April 2012 11 4 ...
Page 226: ...Circuit Description UM353 1B April 2012 12 4 ...
Page 238: ...Model Designation and Specifications UM353 1B April 2012 13 12 EC Declaration of Conformity ...
Page 240: ...Model Designation and Specifications UM353 1B April 2012 13 14 ...
Page 244: ...Abbreviations And Acronyms UM353 1B 14 4 April 2012 ...