Transport, storage and packing
6
9229 9860 176 0E
2013-08-22
Transporting with packing
Transport the transport unit to the installation site or storage location
•
with a fork lift or
•
with sling gear suspended from a crane
-
at an angle of twist of approx. 60° or
-
with a spreader bar.
After receipt of delivery:
Checking the transport
unit
•
Check transport unit for damage.
•
Major damage must be documented photographically.
•
Ensure that any damage to the transport unit is confirmed by the transport com-
pany.
Unpacking (I)
Working equipment
Required tools:
-
Knife/scissors
-
Lifting equipment with lifting gear
-
Pliers or lever.
Opening the transport unit
•
Place the transport unit on a level, non-slip and pressure-resistant surface.
•
Remove lifting gear or transport means.
•
Remove plastic wrap.
•
Lever out fasteners from the carton and lift off carton.
CAUTION
Risk of injury from sharp edges!
Fasteners may break, leaving sharp edges.
Always use a suitable tool to lever out fasteners.
Note
Do not cut open or damage the carton, since it is designed to be reused and
because of the belt straps located underneath.
Belt straps could be severed on the pallet floor when cutting open the carton.
The vacuum circuit-breaker is attached to the pallet with belt straps. It is not pos-
sible to transport the vacuum circuit-breaker on the pallet without using belt straps
(see Fig. 5).
Fig. 3
Removing the carton
Summary of Contents for 3AH3
Page 4: ...4 9229 9860 176 0E 2013 08 22 Blank page ...
Page 16: ...Transport storage and packing 16 9229 9860 176 0E 2013 08 22 Blank page ...
Page 52: ...Operation 52 9229 9860 176 0E 2013 08 22 Blank page ...
Page 58: ...Maintenance 58 9229 9860 176 0E 2013 08 22 Blank page ...
Page 60: ...Index of keywords 60 9229 9860 176 0E 2013 08 22 Blank page ...
Page 62: ...62 9229 9860 176 0E 2013 08 22 Blank page ...
Page 63: ...9229 9860 176 0E 63 2013 08 22 Blank page Siemens Parts ...