Set the vacuum circuit-breaker down onto the square timbers.
•
Hang further sling gear into the transport boreholes.
•
Transport to installation site or leave suspended from crane for further work
steps.
Fig. 8
Positioning the square timbers and setting
down the vacuum circuit-breaker
Fig. 9
Transporting without pallet