108
Final checks
Pole A
Pole B
Pole C
Unit
SF
6
leaktightness testing of newly made joints
SF
6
humidity (dew point)
1)2)
°C
SF
6
content
2)
%
Final SF
6
filling
bar/°C
Date of taking measurements
Date
Leads firmly connected to main terminal
Operations counter reading after completion of work
Damage to paintwork repaired and newly fitted screws painted
1) Maximum permissible dew point during commissioning = -10 °C (+14 °F)
2) Measurements not required if gas filled from a new
cylinder
Remarks
Remarks
Please complete and return to:
Siemens Ltd.
PTD H 3 – Circuit Breaker
E-76, Waluj MIDC
Aurangabad - 431136
India
Fax: +91 240 2554 701