9 Installation
WARNING:
Ensure all power sources are switched off and safely isolated
before installation commences. All switches and MCBs should be in the OFF or
BYPASS position.
The UPS solution’s modular sections have been designed with ease of installation in
mind. Much of the solution comes prewired with simple plug and play interconnects
between modules. The table below lists the steps required for installation of both the UPS
cabinet and the Battery Expansion Cabinet.
Step No.
UPS Cabinet
Battery Expansion Cabinet
Refer to
1
Prepare and install the Reinforced Stool
Section 9.2
2
Pull and gland ducted cables
Section 9.3
3
Fit the Vented Cabinet Outer Case and seal the base
Section 9.4
4
Fit and connect the Battery Housing module(s)
Section 9.5
5
Mount and connect the UPS
housing module
N/A
Section 9.6
6
N/A
Mount and connect the DC
Housing module
Section 9.7
7
Terminate External cables into
the UPS Connection panel
N/A
Section 9.8
8
N/A
Terminate External Cables into
the DC Connection Panel
Section 9.9
9
Terminate and connect the
Ethernet Cable
N/A
Section 9.10
10
Fit and connect the batteries
Section 9.11
11
Connect the Batt. Temp.
sensor
N/A
Section 9.12
Table 9-1: Installation Steps for the UPS and Battery Expansion Cabinets
9.1 Required Tools and Consumables
•
14mm
socket/spanner
•
10mm
socket/spanner
•
10mm insulated spanner
•
5mm Alan key
•
Terminal
Screwdriver
•
Cross-head screw driver
•
RJ45 Crimp Tool
•
Cable
Ties
•
Gorilla
Tape
4
Or similarly industrial self-adhesive tape. Insulation or Electrical tape
is not acceptable
.