8
05.01
8.16 VPM Voltage Protection Module
8-329
©
Siemens AG 2012 All Rights Reserved
SIMODRIVE 611 Configuration Manual (PJU) – 02/2012 Edition
Connection of internal cable routing and VPM 200 Dynamik
VS1
U1
U2
V1
V2
U3
U4
VS2
W1
PE1
X3
W2
PE2
W3
PE3
W4
PE4
VS4
VS3
VS1 +
K1
VS2 +
K2
K3 +
K4 +
VS3
VS4
Attaching the four cable glands
Strip cable to approx. 300 mm, based on the
cable glands you are using, and expose the
shield connection
Apply the cable lug
Connect the cables to X3 and secure them
with the cable tie (see Fig. 8-46)
Insert K1 and K2 into VS1 and VS2 and pull
taught, making sure that the black cable (L1)
and the protective cable are on top.
Connect the individual cables in the following
order:
–
K1 blue (L2)
⇒
V1
–
K2 blue (L2)
⇒
V1
–
K2 green/yellow (PE)
⇒
PE1
–
K1 brown (L3)
⇒
W2
–
K2 black (L1)
⇒
U2
For the time being, do not connect the
remaining three cables
Insert K3 and K4 into VS3 and VS4 and pull
tight, making sure that the black cable (L1)
and the protective cable are on top.
Connect the individual cables in the following
order:
–
K3 blue (L2)
⇒
V2
–
K4 blue (L2)
⇒
V2
–
K3 brown (L3)
⇒
W3
–
K4 green/yellow (PE)
⇒
PE4
–
K4 black (L1)
⇒
U3
–
K1 black (L1)
⇒
U4
–
K3 black (L1)
⇒
U1
–
K2 brown (L3)
⇒
W4
–
K4 brown (L3)
⇒
W1
–
K3 green/yellow (PE)
⇒
PE3
–
K1 green/yellow (PE)
⇒
PE2
Wiring sequence
Where:
K1: Cable 1 (from the converter)
K2: Cable 2 (from the converter)
K3: Cable 3 (from the motor)
K4: Cable 4 (from the motor)
VS1 to VS4: Cable glands 1 to 4
U1 to U4: Terminal studs 1 to 4, phase U
V1 and V2: Terminal studs 1 and 2, phase V
W1 to W4: Terminal studs 1 to 4, phase W
PE1 to PE4: Terminal studs 1 to 4, busbar PE
U: Busbar, phase U
V: Busbar, phase V
W: Busbar, phase W
PE: Busbar PE
Fig. 8-44
Connection of internal cable routing and VPM 200 Dynamik
8 Important Circuit Information
02.07