Commissioning
²
Fasten the device to a symmetric DIN rail as per EN 50022.
²
Check if the operational data match the values on the name plate. Do not change anything on the device.
²
Carefully latch the fiber-optic connections using the bayonet closure.
²
Insert the existing D-sub socket and screw it in place.
²
Connect the fault-signaling connection to the terminals.
²
Switch on the auxiliary voltage.
When the green LED Run lights up, the device is ready for operation.
4.3
Assembly and Commissioning
4.3 Commissioning