32
Revision 04 * INSTALLATION AND OPERATING INSTRUCTIONS 8BT2 * 881-4027.9
NOTE!
For panels equipped with pressure relief duct:
Assemble the pressure relief duct after bolting the panels and main busbars
together.
4.3.2. Fastening the panels to the foundation
The switchgear can be fastened to the foundation in the following ways:
• Welded floor fixing or
• bolted floor fixing or
• floor fixing with dowels.
For fixing the panels on the floor, three holes with a diameter of 14 mm have been provided
in the panel floor. In the foundation, an elongated hole 25 x 45 mm has been provided each.
Fasten every panel to the foundation at these three points.
Wall standing type
Free standing type
Detailed foundation
drawings
Pos.nrs.
: Floor fixing points (Opening dimensions: 25 x 45mm.)
: Floor opening for low voltage control cables
: Floor opening for high voltage power cables
: Switchgear end wall
Note
X, Y, Z, T dimensions are mentioned in drawings on page9 and 10.
Welded floor fixing
Bolted floor fixing
Floor fixing with dowels
Floor fixing
types
A-A section in floor drawings
A-A section in floor drawings
1
st
option
2
nd
option
A-A section in floor drawings
C profile
CB 60-10
Hammer
head screw