Checking for completeness
!
Check whether the delivery is complete and correct using the delivery note and
packing lists.
!
Compare the serial number of the switchgear panels on the delivery note with that
on the packing and the rating plates of the panels.
!
Check whether the accessories are complete.
Checking for transport
damage
!
Unpack the transport units. Do not unpack parts supplied with the switchgear in
order to avoid loss and damage.
!
Inform the forwarding agent immediately about any defects or transport damages; if
required, refuse to accept the delivery.
!
As far as possible, document larger defects and transport damages photographically;
prepare a damage report and inform the Siemens Service Centre immediately.
!
Have the transport damages repaired, otherwise you may not start installation.
!
Check the SF
6
-gas pressure.
!
Refit the packing.
6.3
Checking the SF
6
-gas pressure
The housings of circuit-breakers and non-disconnectable voltage transformers of the
switchgear type 8DA are filled with SF6-gas at the factory. To exclude any gas losses
during transportation in the gas compartments filled at the factory, check the gas
pressure indicators on the panels.
ATTENTION!
Transport units may be damaged if stored without intact packing.
!
If the transport units are stored before installation, open packing for checks only if
the packing is damaged so much that the content must be assumed to be damaged
as well.
!
Refit the packing before installation.
!
Observe instructions to intermediate storage (see Page 9, "Intermediate storage").