6. Electrical function test
Item No.
Commissioning Step Performed
Yes
No
Remarks
6.1
Grounding system continuity test
6.2
Insulation test has been performed with R > 1000
W
/V of the rated
operational voltage. Faults have been located and eliminated.
Wire
L1 – L2
L1 – L3
L2 – L3
L1 – PEN
L1 – PEN
L1 – PEN
PE – PEN
6.3
Control voltage present
6.4
Alarm starting checked
6.5
Release functions checked
6.6
Measuring instruments and indicators checked
6.7
Ground-fault detection checked
6.8
Electrical interlocks of functional units checked
– of device combinations
– of circuit breakers
– transfer trip connection from medium voltage
– others
6.9
Tested after connection to supply
Phase sequence check
right
left
Commissioning company: ................................................... Name: ....................................
Commissioning department: ..................................................
Date: ..............................….................
Signature: ....................................