Document No. 546-00085
Installation Instructions
December 8, 2011
Page 2 of 7
Siemens Industry, Inc.
Instructions
1.
If the Fume Hood Controller will be used with a
field panel, then disconnect the
Field Level
Network (FLN) trunk from the
field panel.
2.
Place the ESD wrist strap on your wrist and
attach it to a good earth ground.
3.
Carefully remove the controller board from the
anti-static bag.
4.
To mount the controller, do one of the following:
•
Center the controller board over the
mounting posts in the bottom of the
controller enclosure (Figure 1). Insert the
corner holes of the board onto the mounting
posts. Press
firmly on the board to snap it
securely into place. Repeat for all
controllers.
•
Secure the mounting rail inside the
enclosure at the controller’s desired
location and snap it into place on the
mounting rail (Figure 2). Repeat for all
controllers.
5. After installing all controller boards, verify that
power is OFF. Connect a certi
fied 24 Vac Class
II power source to the Fume Hood Controller,
see Figure 3.
NOTE:
To meet CE requirements, the
enclosuremust be grounded.
Figure 3. Power Trunk Wiring.
6. Connect the FLN trunk wiring as shown in
Figure 4.
7. After all controllers are connected to the FLN
reconnect the FLN trunk to the
field panel.
CAUTION
Do not connect an earth ground
to the FLN trunk shield terminal.
The earth ground should be
connected only at the field panel
to prevent ground loop currents.
Figure 4. FLN Trunk Wiring.
8. Connect the point wiring for the appropriate
Fume Hood Controller application as shown in
Figure 7 and Figure 8. The wiring for sashes is
shown in Figure 9 through Figure 14. Red/Signal
and Black/Common polarity must be maintained
on all sash sensors. Terminate both connections
of a 24 Vac load directly to the controller board.
The 24 Vac “H” terminal is switched through a
triac to the NO terminations when the associated
DO is energized.
CAUTION
The Fume Hood Controller DOs
control 24 Vac loads only. The
maximum rating is 12 VA for
each DO. For higher ratings an
interposing relay must be used.
9. Follow the instructions in Figure 5.
CAUTION
Ferrite filter(s) must be installed
on the Operator Display Panel
(ODP) cable. If not, the controller
is not FCC and CE compliant.