Document No. 546-00085
Installation Instructions
December 8, 2011
Siemens Industry, Inc.
Page 3 of 7
Figure 5. Installing a Ferrite Filter.
10. Plug the Operator Display Panel cable into the
Operator Display Panel Communication port on
the controller board (Figure 6 and Figure 7).
NOTE:
The ferrite filter must be installed on the
cable inside the enclosure to meet FCC
and CE requirements (Figure 6).
Figure 6. Ferrite Filter Installed.
The installation is complete.