7SR11 & 7SR12 Commissioning and Maintenance Guide
©2017 Siemens Protection Devices Limited
Chapter 6 Page 16 of 72
2.2.2.2
ANSI Reset
If the element is configured as an ANSI characteristic, it may have an ANSI decaying reset delay applied..
ANSI reset times from operated condition to fully reset are as follows for zero applied current and Time multiplier
(TM) = 1.0. The reset curve characteristic type and TM is defined by the operating characteristic.
Curve
Fully operated to reset with Zero current applied & TM=1 (secs)
ANSI-MI
4.85
ANSI-VI
21.6
ANSI-EI
29.1
Apply current in the following sequence, a) 2x setting for a time to ensure element operation, b) Zero current for
the reset time above (xTM), c) 2x setting for a time to ensure element operation. Check that the second operation
(c) is similar to the first (a) and in line with the expected operate time for the element at this current level.
Repeat the test with the reset time (b) reduced to 50% of the previous value. Ensure that the second operate time
(c) is 50% of the first (a) operate time.
Check correct indication, trip output, alarm contacts, waveform record.
2.2.2.3
IEC
R
ESET
If the element is configured as an IEC characteristic, it may have an IEC decaying reset delay applied.
IEC reset times from operated condition to fully reset are as follows for zero applied current and Time multiplier
(TM) = 1.0. The reset curve characteristic type and TM is defined by the operating characteristic.
Curve
Fully operated to reset with Zero current applied & TM=1 (secs)
IEC-NI
9.7
IEC-VI
43.2
IEC-EI
58.2
IEC-LTI
80
Apply current in the following sequence, a) 2x setting for a time to ensure element operation, b) Zero current for
the reset time above (xTM), c) 2x setting for a time to ensure element operation. Check that the second operation
(c) is similar to the first (a) and in line with the expected operate time for the element at this current level.
Repeat the test with the reset time (b) reduced to 50% of the previous value. Ensure that the second operate time
(c) is 50% of the first (a) operate time.
Check correct indication, trip output, alarm contacts, waveform record.
Operate
time
(expected)
Reset time
(calculated)
Operate time
(measured)
50% Reset
Time
(calculated)
50% operate
time
(calculated)
50% operate time
(measured)
First test (c)
Second Test (c)
Summary of Contents for Argus 7SR11
Page 1: ...Energy Management 7SR11 7SR12 Argus Overcurrent Relay Reyrolle Protection Devices ...
Page 2: ......
Page 4: ...7SR11 7SR12 Argus Contents 2015 Siemens Protection Devices Limited Page 2 of 2 ...
Page 170: ...7SR120 Technical Manual Chapter 4 Page 2 of 84 2017 Siemens Protection Devices Limited ...
Page 174: ...7SR120 Technical Manual Chapter 4 Page 6 of 84 2017 Siemens Protection Devices Limited ...
Page 196: ...7SR120 Technical Manual Chapter 4 Page 28 of 84 2017 Siemens Protection Devices Limited ...
Page 242: ...7SR120 Technical Manual Chapter 4 Page 74 of 84 2017 Siemens Protection Devices Limited ...
Page 244: ...7SR120 Technical Manual Chapter 4 Page 76 of 84 2017 Siemens Protection Devices Limited ...
Page 246: ...7SR120 Technical Manual Chapter 4 Page 78 of 84 2017 Siemens Protection Devices Limited ...
Page 254: ...7SR11 7SR12 Installation Guide Chapter 5 Page 2 of 32 2017 Siemens Protection Devices Limited ...
Page 358: ...7SR11 7SR12 Applications Guide Page 2 of 48 2017 Siemens Protection Devices Limited ...
Page 405: ......