2.8.1
Directional Polarity
See section Directional Earth Fault Polarity Check above for testing details.
MTA
Forward
Reverse
Lag (point C)
Lead (point A)
Lead(point B)
Lag (point D)
Pick-up
Drop-off
Pick-up
Drop-off
Pick-up
Drop-off
Pick-up
Drop-off
………….
MTA-85
………..
MTA+85
…………
MTA-85
…………
MTA-85
………...
Measured
EF
2.8.2
Definite Time Overcurrent (67/50G)
If DTL setting is small, gradually increase current until element operates.
If DTL is large apply 0.9x setting, check for no operation, apply 1.1x setting, check operation
Apply 2x setting current if possible and record operating time
Phase
Dir.
Is
(Amps)
DTL
(sec)
P.U. Current
Amps
Operate Time
2 x Is
NOTES
I
4
Check correct indication, trip output, alarm contacts, waveform record.
Note that these elements can be set to directional.
If VTS action is set to BLOCK, this option should be tested. Apply balanced voltage and current. Reduce a-phase
voltage to cause a VTS condition. Increase a-phase current and check that the element does not operate.
If VTS action is set to Non-Directional, this option should be tested. Apply balanced voltage and current. Reduce
a-phase voltage to cause a VTS condition. Increase a-phase current and check that the element operates at its
normal setting. Reverse the voltage phase direction whilst checking that the element does not reset.
2.8.3
Inverse Time Overcurrent (67/51G)
It will be advantageous to map the function being tested to temporarily drive the relevant Pickup output in the
Pickup Config
sub-menu in the
Output Config
menu as this will allow the Pick-up led to operate for the function.
Gradually increase current until Pickup LED operates.
Apply 2x setting current and record operating time,
Apply 5x setting current and record operating time.
Compare to calculated values for operating times
P.U.
D.O.
&
TIMING
TESTS
Ph.
Dir
Char.
(NI EI VI LTI,
DTL)
Is
(A)
TM
Operate Current
Operate Time
P.U.
(Amps)
D.O.
(Amps)
Tol
2 x Is
(sec)
5 x Is
(sec)
Tol
I
4
Summary of Contents for Argus 7SR11
Page 1: ...Energy Management 7SR11 7SR12 Argus Overcurrent Relay Reyrolle Protection Devices ...
Page 2: ......
Page 4: ...7SR11 7SR12 Argus Contents 2015 Siemens Protection Devices Limited Page 2 of 2 ...
Page 170: ...7SR120 Technical Manual Chapter 4 Page 2 of 84 2017 Siemens Protection Devices Limited ...
Page 174: ...7SR120 Technical Manual Chapter 4 Page 6 of 84 2017 Siemens Protection Devices Limited ...
Page 196: ...7SR120 Technical Manual Chapter 4 Page 28 of 84 2017 Siemens Protection Devices Limited ...
Page 242: ...7SR120 Technical Manual Chapter 4 Page 74 of 84 2017 Siemens Protection Devices Limited ...
Page 244: ...7SR120 Technical Manual Chapter 4 Page 76 of 84 2017 Siemens Protection Devices Limited ...
Page 246: ...7SR120 Technical Manual Chapter 4 Page 78 of 84 2017 Siemens Protection Devices Limited ...
Page 254: ...7SR11 7SR12 Installation Guide Chapter 5 Page 2 of 32 2017 Siemens Protection Devices Limited ...
Page 358: ...7SR11 7SR12 Applications Guide Page 2 of 48 2017 Siemens Protection Devices Limited ...
Page 405: ......