background image

CA2N5241E / 11.1998

Siemens Building Technologies

2/4

Landis & Staefa Division

1 2 3 4 5 6 7 1

7

m

h

d

Display panel

Minutes

Hours

Day

Time

Enter / read
programme

Manual control

40567en

–>

Prog.

Display and indicators

1 ... 7

days (1 = Monday)

1 -> 7

Daily programme

ON/OFF

Switch status

00:00

Hours and minutes

H

Holiday programme

Keys

To entrer clock time, day and programme

When programme entry is complete, the display will show the current time after a delay
of 40 seconds. This is an automatic function which will also occur if the input is inter-
rupted for more than 40 seconds. In this case, the last not saved programme point must
be re-entered.

After connection to the power supply, press  d + m + 

 + 

  simultaneously,

to clear / reset the time switch.

Keep the  

  key depressed throughout the setting procedure.

–  Press the  d  key to move the arrow to indicate the current day 1 ... 7 (1 = Monday)
–  Use the  h  and  m  keys to set the current time.
Release the  

  key. The clock will now run.

A weekly programme with a maximum of four ON and four OFF switch-times can be
programmed for one, several or all days of the week, by means of a free block entry
option (see Example 1 below). If all blocks are used for one day, the subsequent days
must accept the same times.

Press Prog. key.

The display reads - -:- - followed by  1 ON  in the right of the display, representing the
ON command for the first time period. Now press d. The arrow will flash above
1 (= Monday). If the switch command is to be carried out on Monday, enter Monday by
pressing the  

  key. Other or additional weekdays can be selected by pressing d,

and entered by pressing  

.

If, for example, the command is to be carried out daily at the same time from Monday to
Friday, each of the numbers 1 ... 5 should be indicated by an arrow. For a  switch
command applying to a full week, all days, 1 ... 7 should be marked by an arrow.
After selection of the switch days, use the  h  and  m  keys to enter the switch-on time.
Save the switch command displayed by pressing  Prog.

The  1 OFF  indicator will now appear in the right of the display window, representing
the OFF command for the first time period. Select the days and OFF time as described
above, and store by pressing  Prog.  Repeat for time periods 2 to 4 as appropriate.
Press  

  when programme entry is complete.

A building is occupied from 8.00 am to 5.30 pm Monday to Friday, and from 8.00 am to
1.00 pm on Saturdays. On Sunday the building is unoccupied.
Because the building is empty during the lunch-hour, the heating plant can be switched
off between 12.30 and 1.30 pm as an economy measure.
For comfort, normal plant on-time is 7.00 am, with an early start (one hour) on Mondays.

Time block

Mon

Tue

Wed

Thur

Fri

Sat

Sun

1

On

06:00

Off

17:30

17:30

17:30

17:30

17:30

2

On

07:00

07:00

07:00

07:00

07:00

Off

12:30

12:30

12:30

12:30

12:30

3

On

13:30

13:30

13:30

13:30

13:30

Off

13:30

4

On

----

----

----

----

----

----

Off

----

----

----

----

----

----

Operating

Programming the BUD

Note

Start-up

Setting day and time

Weekly programme

To start programme entry

Switch-on command

Switch-off command

Example 1

Time-switch settings

Summary of Contents for BUD 5241

Page 1: ... the programme retained for 72 hours However the relay will go to or remain in the normal position 71 72 made When placing an order please specify the quantity product description and type code Example 2 Digital time switches BUD Sheet steel housing printed circuit board with LCD display and programming buttons Mounting instructions Ref 35654 are enclosed with the digital time switch Although micr...

Page 2: ...Monday If the switch command is to be carried out on Monday enter Monday by pressing the key Other or additional weekdays can be selected by pressing d and entered by pressing If for example the command is to be carried out daily at the same time from Monday to Friday each of the numbers 1 5 should be indicated by an arrow For a switch command applying to a full week all days 1 7 should be marked ...

Page 3: ...neously press h and to extend the holiday programme or to reset it to 0 to continue with the automatic programme sequence These options can be carried out before or during the holiday period Press to toggle between ON and OFF This manual operation will be overridden by the next programmed switching sequence This facility is not available during a holiday period Press and m simultaneously to set au...

Page 4: ... W x H x D 54 x 123 x 55 mm see also drawing Dimensions Usage Built in unit for control panel mounting Ambient temperature Operation 0 50 C Storage 25 70 C Ambient humidity 10 90 rh without condensation Snap mounted on DIN rail EN50022 35 x 7 5 or screwed to a flat surface Product safety EN60730 Overvoltage category I I Contamination level 2 Electrical safety SELV E PELV to IEC364 4 1 Function Typ...

Reviews: