Preface
CP 154xSP-1
Operating Instructions, 12/2019, C79000-G8976-C426-05
5
Replaced edition
Edition 02/2018
Structure of the documentation
The documentation for the three CP types consists of the following manuals and contents:
●
Operating instructions
Valid for all three CP types
–
Application and functions
–
Requirements (CPUs, configuration software, etc.)
–
Hardware description
–
Installation, wiring, commissioning, operation
–
Configuration of the CP 1542SP-1 and CP 1543SP-1
For information on configuring the CP 1542SP-1 IRC, refer to the configuration
manuals.
–
Diagnostics, maintenance
–
Technical specifications, approvals, accessories
●
Configuration manuals (CP 1542SP-1 IRC)
Configuration of the CP 1542SP-1 IRC is described in the following additional documents:
–
SINAUT ST7 system manual
Volume 3 - Configuration under STEP 7 Professional (TIA Portal)
–
Configuration manual Telecontrol Basic
Configuration and diagnostics in STEP 7 Professional (TIA Portal)
–
Configuration manual DNP3
Configuration and diagnostics in STEP 7 Professional (TIA Portal)
–
Configuration manual IEC
Configuration and diagnostics in STEP 7 Professional (TIA Portal)
You can find the Internet links for the manuals in the appendix Documentation references
(Page 113).
Required experience
To install, commission and operate the CP, you require experience in the following areas:
●
Automation engineering
●
Setting up the SIMATIC ET 200SP
●
SIMATIC STEP 7 Professional